Coke-Gas Pipeline Pre-Construction Walkthrough 2005 Posted on November 23, 2020 by mscadmin - Screen Shot 2019-01-07 at 2.20.21 PM Screen Shot 2019-01-07 at 2.19.55 PM Screen Shot 2019-01-07 at 2.20.10 PM Screen Shot 2019-01-07 at 2.20.10 PM(1) Screen Shot 2019-01-07 at 2.19.44 PM 021 21A 021 21 020 20A 020 20 019 19A 019 19 018 18A 018 18 017 17A 016 16A 015 15A 014 14A 013 13A 013 12A 012 12A 012 12 (1) 011 11A 011 11 010 10A 009 9A 008 8A 008 8 007 7A 006 6A 005 5A « ‹ of 2 › »